Sorting & Separation Plant Automation.

We successfully completed an industrial project within just 6 months from the order, providing turnkey solutions for industrial automation. The starting point was the supply of a control container, inside which all the panels were installed, facilitating their transport and connection to the existing plant. Inside, electrical panels were designed and installed for the separation plant, based on advanced technologies such as Siemens S7-1200 PLCs and Sinamics G120 inverters. Supervision is managed through Siemens WinCC for complete operator control. The project was developed in collaboration with a leading company in the sector, which handled the entire software part, while we focused on hardware and installation. This project is a tangible example of our collaboration and expertise, highlighting our ability to provide complete solutions for industrial automation.